The Conversion of a Science Institute to a Faculty Library in Ghent, Belgium ...
The Faculteit Letteren en Wijsbegeerte/Faculty of Arts and Philosophy of Universiteit Gent/Ghent University held 50 different library collections, containing 670,000 books, which were scattered over 222 different locations in the city of Ghent. The dispersed collections were a legacy of the former seminar instruction method favoured by many professors in the past and no longer met the needs of academic research and education in the 21st century. A masterplan was developed to bring the collections together. Central to the plan was the renovation of the historic neoclassical building known as th... Mehr ...
Verfasser: | |
---|---|
Dokumenttyp: | article-journal |
Erscheinungsdatum: | 2021 |
Verlag/Hrsg.: |
Humboldt-Universität zu Berlin
|
Schlagwörter: | Academic libraries – Belgium / Library buildings – Design and construction / Historic buildings – Remodelling for other use / 020 Bibliotheks- und Informationswissenschaften |
Sprache: | Englisch |
Permalink: | https://search.fid-benelux.de/Record/base-29383067 |
Datenquelle: | BASE; Originalkatalog |
Powered By: | BASE |
Link(s) : | https://dx.doi.org/10.18452/23412 |
The Faculteit Letteren en Wijsbegeerte/Faculty of Arts and Philosophy of Universiteit Gent/Ghent University held 50 different library collections, containing 670,000 books, which were scattered over 222 different locations in the city of Ghent. The dispersed collections were a legacy of the former seminar instruction method favoured by many professors in the past and no longer met the needs of academic research and education in the 21st century. A masterplan was developed to bring the collections together. Central to the plan was the renovation of the historic neoclassical building known as the Institut des Sciences/Institute for the Sciences dating from 1892. The project included both the renovation of the building and the amalgamation of all 50 collections under one roof. A primary concern during the renovation process was finding the appropriate balance between the requirements of historic building conservation and the needs of a modern library. After more than ten years of preparation, planning, ...