Underwater sound emissions and effects of the pile driving of the OWEZ windfarm facility near Egmond aan Zee (Tconstruct)

The aim of this part of the Monitoring and Evaluation Program NSW (MEP-NSW), i.e. “acoustic measurements”, is to measure and analyze underwater sound emissions from the construction of the OWEZ wind farm and to investigate the effects to marine animals (in particular fish, harbour porpoises and seals) from other relevant studies. The Off-Shore Wind farm Egmond aan Zee (OWEZ) was built in the Dutch coastal zone 8 - 18 km off the coast from Egmond aan Zee. It consists of an arrangement of 36 wind turbines with a total capacity of 108 MW.

Verfasser: de Haan, D.
Burggraaf, D.
Ybema, M.S.
Hille Ris Lambers, R.
Dokumenttyp: report
Erscheinungsdatum: 2007
Verlag/Hrsg.: IMARES
Schlagwörter: acoustic emissions / civil engineering / construction / environmental impact / netherlands / noise pollution / north sea / offshore / piles / sound production / underwater acoustics / wind power / windmills / akoestische emissie / civiele techniek / constructie / geluidshinder / geluidsproductie / milieueffect / nederland / noordzee / onderwaterakoestiek / pijlers / windenergie / windmolens
Sprache: Englisch
Permalink: https://search.fid-benelux.de/Record/base-29204545
Datenquelle: BASE; Originalkatalog
Powered By: BASE
Link(s) : https://research.wur.nl/en/publications/underwater-sound-emissions-and-effects-of-the-pile-driving-of-the