De inpassing van de Barbierbeek in het gecontroleerd overstromingsgebied Kruibeke-Bazel-Rupelmonde

This report deals with the possibilities to fit the Barbier-brook in the Controlled lnundation Area of Kruibeke, Bazel en Rupelmonde that was planned according the Sigmaplan. The so called CIA-KBR is situated upstream Antwerp. The CIA-KBR will be inundated when a certain flood on the river Schelde overflows the lowered river dike. The result is a decrease of the peak of the flood. A dike at the polder side will fulfill the defensive function during the period of inundation. This dike is called the "ringdike". The Barbier-brook cuts through the CIA-KBR. Within the CIA the Barbier-brook is diked... Mehr ...

Verfasser: Hettinga, O.
Van der Welle, J.
van Oevelen, D.
Meire, P.
Dokumenttyp: Buch
Erscheinungsdatum: 1998
Schlagwörter: Environmental monitoring / Flood control / Belgium / Schelde R / Zeeschelde / Bazel / Barbierbeek / Kruibeke / Rupelmonde
Sprache: Niederländisch
Permalink: https://search.fid-benelux.de/Record/base-28523737
Datenquelle: BASE; Originalkatalog
Powered By: BASE
Link(s) : https://www.vliz.be/imisdocs/publications/260246.pdf