Economic evaluation of offshore wind power in the liberalized Dutch power market

The variability and limited predictability of wind power challenges the operation of power systems, where the generation and load are required in balance at all times. The transmission system operator (TSO) is the responsible party. In a liberalized energy sector, key technical elements of power system operation have been transferred to markets and are thereby translated into economic responsibilities born by all system parties. The Dutch TSO TenneT operates the 15 min interval real-time system balancing the market platform where energy responsibilities are economically assessed. Market partie... Mehr ...

Verfasser: Chang, J
Ummels, BC
Van Sark, Wilfried
Rooijen, HPGM den
Kling, WL Wil
Dokumenttyp: article / Letter to the editor
Erscheinungsdatum: 2009
Verlag/Hrsg.: Wiley
Sprache: Englisch
Permalink: https://search.fid-benelux.de/Record/base-27449927
Datenquelle: BASE; Originalkatalog
Powered By: BASE
Link(s) : http://repository.tue.nl/657292