GEOFOOD – RAS and heating installation in The Netherlands : Half-yearly update report no. 1 - May 2019

January 21st 2019 marked the start of the construction of the RAS- and aquaponic research facilities for the GEOFOOD project. The new aquaponic system was built within the existing greenhouse research facilities of Wageningen University & Research which are located in Bleiswijk, the Netherlands. This report summarizes the design choices and construction process that preceded completion of the facilities in May 2019.

Verfasser: Boedijn, Alexander
de Poot, Eric
Espinal, Carlos
van de Ven, Rob
Dokumenttyp: report
Erscheinungsdatum: 2020
Verlag/Hrsg.: Wageningen Plant Research
Schlagwörter: Life Science
Sprache: Englisch
Permalink: https://search.fid-benelux.de/Record/base-27223662
Datenquelle: BASE; Originalkatalog
Powered By: BASE
Link(s) : https://research.wur.nl/en/publications/geofood-ras-and-heating-installation-in-the-netherlands-half-year-2