GEOFOOD – RAS and heating installation in The Netherlands : Half-yearly update report no. 1 - May 2019
January 21st 2019 marked the start of the construction of the RAS- and aquaponic research facilities for the GEOFOOD project. The new aquaponic system was built within the existing greenhouse research facilities of Wageningen University & Research which are located in Bleiswijk, the Netherlands. This report summarizes the design choices and construction process that preceded completion of the facilities in May 2019.
Verfasser: | |
---|---|
Dokumenttyp: | report |
Erscheinungsdatum: | 2020 |
Verlag/Hrsg.: |
Wageningen Plant Research
|
Schlagwörter: | Life Science |
Sprache: | Englisch |
Permalink: | https://search.fid-benelux.de/Record/base-27223662 |
Datenquelle: | BASE; Originalkatalog |
Powered By: | BASE |
Link(s) : | https://research.wur.nl/en/publications/geofood-ras-and-heating-installation-in-the-netherlands-half-year-2 |