Setting up a decision rule from estimated uncertainty : emission limit value for PCDD and PCDF incineration plants in Wallonia, Belgium.

peer reviewed ; Complex analytical procedures are often required to prove the non-compliance with a specific legislation. In the case of a small overlap of the limit, integration of the method uncertainty in the decision-making process is essential. The decision rule proposed in Wallonia, Belgium, for the non-compliance of waste incineration plants with the EU limit value for PCDD and PCDF emissions is presented. The method uncertainty was estimated annually over 6 years from duplicate measurements using two top-down approaches. Depending on the congener, the standard uncertainty varies from 3... Mehr ...

Verfasser: Bergmans, B.
Idczack, F.
Maetz, P.
Nicolas, Jacques
Petitjean, S.
Dokumenttyp: journal article
Erscheinungsdatum: 2008
Verlag/Hrsg.: Springer
Schlagwörter: Uncertainty / Top-down / Bottom-up / Decision-making / Dioxin / Life sciences / Environmental sciences & ecology / Sciences du vivant / Sciences de l’environnement & écologie
Sprache: Englisch
Permalink: https://search.fid-benelux.de/Record/base-26901405
Datenquelle: BASE; Originalkatalog
Powered By: BASE
Link(s) : https://orbi.uliege.be/handle/2268/14186

peer reviewed ; Complex analytical procedures are often required to prove the non-compliance with a specific legislation. In the case of a small overlap of the limit, integration of the method uncertainty in the decision-making process is essential. The decision rule proposed in Wallonia, Belgium, for the non-compliance of waste incineration plants with the EU limit value for PCDD and PCDF emissions is presented. The method uncertainty was estimated annually over 6 years from duplicate measurements using two top-down approaches. Depending on the congener, the standard uncertainty varies from 30 to 85%, with a good correlation between calculations. The analytical contribution was estimated using a bottom-up evaluation. The impact of the sampling step was deduced from the whole estimation and represents more than 80% of the total uncertainty budget. No optimisation is foreseen at this time because of practical field constraints. Based on the average fraction of each congener, the uncertainty associated with the measurement result has been established and shows a high stability over the years. Using this value, a guard band has been calculated and will be proposed to the regulatory body.