Engineer Leandro Badarán’s project to safeguard the fortresses of Alicante in 1794

After the construction of the San Carlos bastion in Alicante in the final decade of the seventeenth century, and the great trench which the English built around the district of San Francisco during their years of dominance in the War of Succession, the waters of the San Blas gully caused serious damage to these fortifications of the city and to the trade buildings of the port. In 1772, the diversion canal was built. It was designed to divert the riverbed of the gully and send the waters directly to the sea. The project had been initially designed by the Engineer General, Jorge Próspero de Verb... Mehr ...

Verfasser: Echarri-Iribarren, Víctor
Dokumenttyp: Artikel
Erscheinungsdatum: 2016
Verlag/Hrsg.: WIT Press
Schlagwörter: Fortifications / Military engineers / Jorge Próspero de Verboom / Leandro Badarán / Francisco Sabatini / Alicante / Construcciones Arquitectónicas
Sprache: Englisch
Permalink: https://search.fid-benelux.de/Record/base-26875576
Datenquelle: BASE; Originalkatalog
Powered By: BASE
Link(s) : http://hdl.handle.net/10045/56437