Risk Mitigation and Investability of a U-PHS Project in The Netherlands

We review the status of a 1.4 GW, 8 GWh underground pumped hydro storage (U-PHS) project in the southern Netherlands, which has been under development since the 1980s. Its history shows how the prospect of a large-scale U-PHS for The Netherlands (a country whose proverbial flatness prohibits PHS) has been attractive in every decade, based on proven technology in a subsurface location with validated properties, and solid analysis of its economics. Although the ongoing energy transition clearly requires massive electricity storage, (U-)PHS projects are challenging investment propositions, in The... Mehr ...

Verfasser: Gert Kramer
Twan Arts
Janos Urai
Han Vrijling
Jan Huynen
Dokumenttyp: Text
Erscheinungsdatum: 2020
Verlag/Hrsg.: Multidisciplinary Digital Publishing Institute
Schlagwörter: pumped hydro storage / electricity storage / renewable energy / electric grid stabilization / energy transition / regional economic development
Sprache: Englisch
Permalink: https://search.fid-benelux.de/Record/base-26809838
Datenquelle: BASE; Originalkatalog
Powered By: BASE
Link(s) : https://doi.org/10.3390/en13195072

We review the status of a 1.4 GW, 8 GWh underground pumped hydro storage (U-PHS) project in the southern Netherlands, which has been under development since the 1980s. Its history shows how the prospect of a large-scale U-PHS for The Netherlands (a country whose proverbial flatness prohibits PHS) has been attractive in every decade, based on proven technology in a subsurface location with validated properties, and solid analysis of its economics. Although the ongoing energy transition clearly requires massive electricity storage, (U-)PHS projects are challenging investment propositions, in The Netherlands, as elsewhere. This case study illustrates a point of general relevance, namely that although the project execution risk, related to uncertainty with respect to subsurface integrity, is very low, the transition risk, associated with the intrinsic uncertainties of an electricity system in transition, is significant. We point out mitigation strategies for both risk categories.