Reasons for contract changes in implementing Dutch transportation infrastructure projects: An empirical exploration
__Abstract__ An important contributor to cost overruns of infrastructure projects is contract changes after the construction contract has been concluded. Using mainly descriptive statistics and non-parametric tests, real project data were analyzed from forty-five Dutch transportation infrastructure projects with a total construction contract value of over € 8.5 billion. First it was explored if we could find evidence for the presumption that contractors bid low on contracts to recover the loss of bid profit by claiming contract change costs in the project implementation. We conclude that we co... Mehr ...
Verfasser: | |
---|---|
Dokumenttyp: | Artikel |
Erscheinungsdatum: | 2015 |
Schlagwörter: | Transportation infrastructure project / Contract change / Scope change / Construction claims / Contract omission |
Sprache: | Englisch |
Permalink: | https://search.fid-benelux.de/Record/base-26677881 |
Datenquelle: | BASE; Originalkatalog |
Powered By: | BASE |
Link(s) : | http://repub.eur.nl/pub/77230 |