Ernest Holland Library, projection, 1948
Reinforced concrete building with brick veneer face, Class A construction. Overall dimensions are 135 x 270 feet and there will be four stories and basement. The building will be completely air-conditioned and will have asphalt tile floors and acoustical tile ceilings. Floor area will total 207,900 square feet. Heated by steam from Central Heating Plant. Completion Date: April 1950 (tentative). Cost: $2,673,697 (est.). Cost per square foot: $12.95. Cost per cubic foot: $1.10. Source of funds: State of Washington. Remarks: When completed the Ernest Holland Library will house more than one milli... More ...
Document Types: | Image |
---|---|
Publication Date: | 1948 |
Subjects: | Campus buildings--Washington (State)--Pullman ; Libraries |
Language: | unknown |
Permalink: | https://search.fid-benelux.de/Record/base-4314503 |
Collection: | BASE; Original Catalogue |
Powered By: | BASE |
Reinforced concrete building with brick veneer face, Class A construction. Overall dimensions are 135 x 270 feet and there will be four stories and basement. The building will be completely air-conditioned and will have asphalt tile floors and acoustical tile ceilings. Floor area will total 207,900 square feet. Heated by steam from Central Heating Plant. Completion Date: April 1950 (tentative). Cost: $2,673,697 (est.). Cost per square foot: $12.95. Cost per cubic foot: $1.10. Source of funds: State of Washington. Remarks: When completed the Ernest Holland Library will house more than one million volumes and accommodate 2,000 readers.